Sunny and Kevin

Welcome to Sunny and Kevin's home on the web

Before and After – Bathroom

Sunday, December 5th, 2010 at 7:36 am

The kitchen was tough, but the bathroom was by far the most time-consuming room to remodel. Sunny spent more time picking out fixtures in this room than any other. In fact, when we were done, only the tub remained from the original bathroom (and we almost replaced that too). We replaced the mirror with a medicine cabinet from Kohler. The faucet, pedestal sink, and toilet are also from Kohler. The tub and shower fixtures are from American Standard (I specially ordered the round escutcheon plate). The mosaic tile floor is gorgeous. We ran a heating pad below the tile which warms your feet – I almost don’t want to leave! We used a recessed light with a quiet fan on a mechanical 60 minute timer. I finished the room with a dimmer switch on the recessed light for comfort. Sunny and I put a lot of care in this room and it has become one of my favorite rooms in the house. Here is a few quick before and after comparison:

Tags »

Author:
Date Posted: Sunday, December 5th, 2010 at 7:36 am
Date Last Modified: Thursday, December 30th, 2010 at 3:41 pm
Trackback: Trackback-URL Category: House Blog, Kevin's Blog

RSS Feed: RSS 2.0 This Article: Comment

Comments

Login Required | Please Register